ACHIEVEMENTS
Accomplishments |
|
|||
|
||||
|
||||
1 |
|
A concrete entrance & cemented corridor to indoor and casualty
|
||
2 |
|
Institution have now fully functional 2 nos 300MA and 2 Nos portable 50MA x-ray machines with acquisition of 1 No Dental x-ray unit.
|
||
3 |
|
The registered Blood Bank is rendering yeoman’s service wef 19th Feb 2001 with availability of sophisticated refrigerator for storage.
|
||
4 |
|
All laboratories – pathology, serology, microbiology, malaria, tuberculosis are functional throughout the year.
|
||
5 |
|
2 Nos ultrasound machines are being utilized for specific investigations.
|
||
6 |
|
All sections of OPD & IPD are well EPBX networked with telephone & broadband services in the administrative block.
|
||
7 |
|
3-shifts (morning, evening & night) emergency service is catering patient’s requirement to maximum
|
||
8 |
|
A Hospital development Committee was formed on 7th April 2000 on initiation of DR AC Verma, then DC Pasighat and Dr T Tapak, then Minister(H)
|
||
9 |
|
A medicine counter within the hospital complex, operated 24x7 by Pasghat LAMPS since the year 2000 has helped patients acquiring medicines in emergency and odd hours.
|
||
10 |
|
A bio-medical waste management plant, constructed with central assistance of Rs 70,88,250/- is fully functional since its commission on 3rd June 2004. The Incinerator, a costly acquisition exists only a few in the entire NE
|
||
11 |
|
A deep tube well bored with financial assistance of Rs 8 Lakhs by Deptt of IFCD, Pasighat has solved the frequent water crisis since its commission on 12th May 2004
|
||
12 |
|
Laparoscopic procedure in GHP started on 12th Sept 2004 with inaugural operation by visiting Professor, Dr Zaman from AMCH, Dibrugarh. The milestone in surgery was directly transmitted live from the OT to the common masses for the first time.
|
||
13 |
|
Hospital Management Society was constituted in General Hospital Pasighat & registered under Societies Act on 21st Sept 2006
|
||
14 |
|
Availability of basic amenities like Drinking water, Patients waiting space & seating arrangements, Complain Box
|
||
15 |
|
The Central Registration Counter, fully managed by HMS is opened in GHP for the ease of patients
|
||
16 |
|
Urban Health Centre with one Lady Medical Officer, 4 Nurses, 1 Laboratory Technician, 5 Attendants and 19 Link Volunteers, provides the basic medical needs of the urban population of township.
|
||
17 |
|
Pay Cabin is made operational. The shortage of staff was fulfilled by recruiting 3 Nos ANM and 3 Nos Attendants on contract basis by the Hospital management Society wef Sept/2008
|
||
18 |
|
HTRC Pasighat is one of the beginners to implement fully computerized Payroll system for its 200+ employees. |
||
|
||||
|
||||
Infrastructure developments |
|
|||
|
||||
|
||||
1 |
|
The School of Nursing was shifted from the then existent cramped classrooms to separate building with provisions of 2 big lecture halls (ANM & HA students), demonstration room, faculty rooms, office room etc on 1st July 2003
|
||
2 |
|
Operation Theatre and Labour Room in a separate blocks with all requisite facilities were inaugurated on 30th Nov 2000 by then-CM Shri Mukut Mithi
|
||
3 |
|
Eye Ward started functioning wef 11th March 2002
|
||
4 |
|
Emergency & Trauma Wing constructed under CSS scheme - Pilot Project for Up-gradation & Strengthening of Emergency facilities at General Hospital, started functioning wef 4th Feb 2004
|
||
5 |
|
30-bedded Nurses Hostel was inaugurated on 11th Sept 2006
|
||
6 |
|
The Public Utility Toilet in GHP, constructed from MLA’s Local Area Development fund started functioning wef 11th Sept 2006
|
||
7 |
|
A Telemedicine Centre was setup under technical guidance of ISRO in 2006 with hardware provider Bharat Electronics Limited (BEL) and software installer Televital and operation modalities supported by Global Telemedicine Healthcare Network Foundation.
|
||
8 |
|
Incomplete two blocks Maternal & Child Health complex at GHP (conceived in 1994 with estimated cost of Rs 1.20 Crore) was ultimately taken up by National Mission on Bamboo Application (NMBA) in Nov/2005 with combined funding of Rs 69,51,000/- by NMBA (Rs 22,94,000/-) and State Govt (Rs 46,57,000/-). It was inaugurated on 14th Oct 2006 by Shri Kapil Sibal, Union Minister (Science & Technology) |
||
9 |
|
Administrative Block, previously merged with hospital blocks, shifted to new location during August/2005. All sections are computerized for ready networking & e-governance.
|
||
10 |
|
Compound Wall around the Hospital was completed with Special Plan Assistance of Rs 70,16,400.00
|
||
11 |
|
Following devastating fire at GHP on 7th Dec 2006, new constructions of OPD complex & laboratory blocks were undertaken with State Plan Assistance of Rs 80,000,00.00 and inaugurated on 2nd Feb 2008
|
||
12 |
|
The lingering construction of ICU and Pay Cabin since 1991 ultimately was finished with SPA assistance and inaugurated on 2nd Feb 2008
|
||
13 |
|
Parking Slot is constructed under funding of Ministry of Urban Development, Govt of India and was inaugurated on 2nd Feb 2008
|
||
14 |
|
Hospital canteen started functioning wef 25th Feb 2008 catering the long felt necessity for the foodings of patient’s attendants.
|
||
15 |
|
The Auditorium & Lecture Hall was renovated with permanent stage with Additional Central Assistance of 34,75,100.00
|
||
16 |
|
The Toilet block in the Nurses Hostel was constructed with ACA funding of Rs 2,63,300.00
|
||
17 |
|
Approach road was constructed with ACA fund of Rs 2,27,000.00
|
||
18 |
|
Psychiatric Wing under National Mental Health Programme was completed within Rs 2,00,000.00 and equipments like ECT machines have been procured during Mar/2008
|
||
19 |
|
Specialty Clinic Homeopathy under Central Assistance from AYUSH for Rs 3,00,000.00 was completed and inaugurated on 8th Sept 2008 by ex-DHS, Dr H Lodor.
|
||
20 |
|
Ayurveda Wing under Central Assistance from AYUSH for Rs 10,00,000.00 was completed and inaugurated by ex-DHS, AP Dr Hage Lodor on 8th Sept 2008
|
||
21 |
|
Repairing of 30-bed Indoor was under taken within an amount of Rs 2,10,800.00
|
||
22 |
|
Urban Health Centre (UHC) under National Rural Health Mission was opened as make-shift arrangement in 11th Dec 2006 and after its permanent structure at Baskota village, it was formally inaugurated on 13th July 2007.
|
||
23 |
|
Repair of SPT Buildings (Specialist Block) during Mar/2008 with Corpus Fund of Rs 7,00,000/- provided by NRHM
|
||
24 |
|
Renovation / reconstruction / electrification of SP-type building for MCH Block along with Eye OT within Rs 6,43,500/- funded by NRHM (Rs 3,00,000/-) & Hospital Management Society (Rs 3,43,500/-) during Aug/2008
|
||
25 |
|
Maternity Hospital Block, constructed by NRHM funding, was inaugurated by Shri M Mithi, Hon MP on 1st Sept 2008
|
||
26 |
|
A detailed project report for establishment of GNM School of Nursing at HTRC with infrastructural developments (Rs 171600000/-) and other amenities (Rs 2941906/-) amounting to Rs 17,45,86,092.00 is submitted under process through National Rural Healtj Mission.
|